{"id":372,"date":"2021-07-20T16:15:00","date_gmt":"2021-07-20T19:15:00","guid":{"rendered":"https:\/\/nacalalogistics.com\/?p=372"},"modified":"2021-07-20T16:15:00","modified_gmt":"2021-07-20T19:15:00","slug":"nacala-logistics-joins-the-noble-cause-of-conservation","status":"publish","type":"post","link":"https:\/\/silvermoz.com\/nacalateste\/2021\/07\/20\/nacala-logistics-joins-the-noble-cause-of-conservation\/","title":{"rendered":"Malawi Vice President inspects Nacala Logistics projects."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The country&#8217;s Vice President Dr. Saulos Klaus Chilima visited Nacala Logistics on 20th July 2021 to appreciate some of the projects being carried out by the company.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chilima started the tour by visiting the company\u2019s Control Centre of Operations before sitting down with Nacala Logistics personnel where he was briefed on the rehabilitation works and investments the company is making to ensure smooth railway operations. He then inspected construction works of the Limbe container terminal (Limbe Dry port), aimed at boosting the company\u2019s cargo handling capacity.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img fetchpriority=\"high\" decoding=\"async\" width=\"2362\" height=\"1576\" src=\"http:\/\/nacalalogistics.com\/wp-content\/uploads\/2021\/08\/vp2-1.jpg\" alt=\"\" data-id=\"440\" data-link=\"https:\/\/nacalalogistics.com\/en\/nacala-logistics-joins-the-noble-cause-of-conservation\/vp2-1\/\" class=\"wp-image-440\" srcset=\"https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1.jpg 2362w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1-300x200.jpg 300w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1-1024x683.jpg 1024w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1-768x512.jpg 768w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1-1536x1025.jpg 1536w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp2-1-2048x1366.jpg 2048w\" sizes=\"(max-width: 2362px) 100vw, 2362px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"2362\" height=\"1576\" src=\"http:\/\/nacalalogistics.com\/wp-content\/uploads\/2021\/08\/vp3.jpg\" alt=\"\" data-id=\"441\" data-link=\"https:\/\/nacalalogistics.com\/en\/nacala-logistics-joins-the-noble-cause-of-conservation\/vp3\/\" class=\"wp-image-441\" srcset=\"https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3.jpg 2362w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3-300x200.jpg 300w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3-1024x683.jpg 1024w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3-768x512.jpg 768w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3-1536x1025.jpg 1536w, https:\/\/silvermoz.com\/nacalateste\/wp-content\/uploads\/2021\/08\/vp3-2048x1366.jpg 2048w\" sizes=\"(max-width: 2362px) 100vw, 2362px\" \/><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Vice President also visited the rehabilitated Nansadi railway bridge in Thyolo then later inspected rehabilitation work of the Luchenza railway station, scheduled to be completed in December 2021.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The country&#8217;s Vice President Dr. Saulos Klaus Chilima visited Nacala Logistics on 20th July 2021 to appreciate some of the projects being carried out by the company. Chilima started the tour by visiting the company\u2019s Control Centre of Operations before sitting down with Nacala Logistics personnel where he was briefed on the rehabilitation works and investments the company is making to ensure smooth railway operations. He then inspected construction works of the Limbe container terminal (Limbe Dry port), aimed at boosting the company\u2019s cargo handling capacity. The Vice President also visited the rehabilitated Nansadi railway bridge in Thyolo then later inspected rehabilitation work of the Luchenza railway station, scheduled to be completed in December 2021.<\/p>\n","protected":false},"author":4,"featured_media":438,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[55],"tags":[],"class_list":["post-372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized-en"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/posts\/372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/comments?post=372"}],"version-history":[{"count":0,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/posts\/372\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/media\/438"}],"wp:attachment":[{"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/media?parent=372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/categories?post=372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/silvermoz.com\/nacalateste\/wp-json\/wp\/v2\/tags?post=372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}